Ultra Prime Hotel and Private Residences
A new-build luxury hotel with 190 rooms and 25 private residences at Hyde Park Corner, built over five basement levels.
PROJECT VALUE
£1,000,000,000+
LOCATION
London, United Kingdom
CONTRACT FORM
Construction Management
PROJECT DURATION
Seven Years
LIFECYCLE STAGE
Delivery Controls & Dispute Resolution

Ultra Prime Hotel and Private Residences
THE PROJECT IN DETAIL
The Challenge: Where the Programme Was at Risk
A landmark hotel and private residences built five storeys below ground and finished to an exceptional standard. Under construction management, a large number of trade packages ran side by side, each with its own programme. Changes during delivery had to be assessed package by package, so the client needed a clear, independent view of time throughout.
Our Role: What We Did and How It Made a Difference
Monitored the project through design, procurement, construction, commissioning and operational readiness, keeping the master programme and package schedules aligned and reporting progress to the client team. Assessed extension of time requests package by package, and continued to support the client after completion with independent analysis to resolve the remaining time disputes.
THE OUTCOME FOR THE CLIENT
The client had an independent view of time across every package, from design to opening and beyond. Extension of time requests were assessed on clear evidence, and the client’s position in post-completion disputes rested on a sound factual basis.
Our view: under construction management, time is won or lost package by package. Independent monitoring from design to opening gives the client a clear position whenever a change or claim arises.
Planning a Similar Development?
Independent assurance at every stage, from appraisal through to completion and beyond.