The multi-storey facility was constructed using a steel frame supported from mass fill concrete pads. The envelope was formed using a structural framing system which was clad using a combination of insulated render and timber cladding. Roofing consisted of a lightweight single ply membrane solution which was formed in parallel with the envelope. Internal fit-out activities included offsite prefabricated services modules to provide efficiencies to the construction schedule.